8 DESIGN MEETS DATA AND TIME Close cooperation between the builder, planner and engineers is essential to achieve optimal time man- agement on the construction site. To achieve this, architects and building contractors are working with up-to-date BIM (Building Information Modeling) tech- nology as early on as the design phase. This en- sures a transparent exchange of information be- tween all participants in the construction project. Scalable model data of the necessary walls and slabs will later be created from the 3D CAD building data, which will be optimally scheduled in terms of production technology, using CAD/CAM control. Whether a project requires solid and sandwich walls, floor slabs, beams or special concrete parts, our experts will work out an individually designed system concept for you using 3D visualization mo- dels. Modern system solutions, such as the Vollert Control Centre, control all processes in the produc- tion of precast concrete elements and provide you with an evaluation of the productivity of the pro- duction plant. We turn your vision and ideas into reality. As a result, you are always able to produce the re- quired capacities for the next construction projects. EXPERTISE, STATE-OF-THE-ART MACHINES AND INDUSTRY 4.0 To be successful today, a precast production plant needs a manufacturing concept adapted to the building system, state- of-the-art machine technology and integrated data flows from the architect's first 3D models to the installation of the concrete elements on the site. That demands the expertise of experts.

RkJQdWJsaXNoZXIy MTUwNzEy