Brochure Special crane systeme | Vollert english

17 16 NEUMAN ALUMINIUM, AUSTRIA A Vollert automatic crane system featuring 21 change cycles is the new hub of the extrusion production process at Neuman Aluminium’s aluminium plant. The new traveling crane moves skips weighing 3 t that contain aluminium profiles, weighs them, puts them in interim sto- rage and sends them for post-treatment heating, during which it precisely stacks up to 5 skips one on top of the other. Advance centering per- mits precise stacking. Material moves along the 60-m long crane track at 4 m/s. The old craneway was replaced, and the new automatic crane installed within just 14 days. 1 The automatic crane undertakes 21 cycles at a travel speed of up to 4 m/s PAYLOAD 3 t SPAN 8.5 m SPEED Bridge: 4 m/s | Lift: 0.7 m/s TRAVEL DISTANCE Bridge: 55 m | Lift: 6.4 m 1 A Vollert automatic crane system is the new hub of the extrusion production process at Neuman Aluminium’s plant PROJECT DETAILS High-performance crane incorporating an inbuilt scale, servicing 80 floor-based storage bins. Stacked up to 5 high. Very small distances between the stacks. AUTOMATIC CRANE FOR ALUMINIUM PROFILES HIGHLIGHTS 21 change cycles, movement speed up to 4 m/s, positioning accuracy ±3 mm, scale accuracy up to 0.5%, motor-powered pre-centering for stack formation. REFERENCE PROJECT 1 1

RkJQdWJsaXNoZXIy MTUwNzEy