Brochure Special crane systeme | Vollert english

23 22 ZHONGWANG GROUP, CHINA For secure transport of sensitive ingots and aluminium coils throughout the material flow process, from melting to loading, Zhongwang Group has chosen a fully automated Vollert intralogistics system for its new mega aluminium plant in Tianjin. 16 automatic cranes operating on 500 m lengths of craneway and with spans of up to 31.5 m serve several floor-based storage areas and connect the stress-relieving furnaces with the processing and finishing at speeds of up to 4 m/s. Laser-controlled bi-directional measuring systems monitor and control transport. 1 Positioning accuracy of the automatic crane is ±3 mm in spite of the large flat storage area. A laser-controlled bi-directional measuring system on both sides ensures this PAYLOAD Max. 35 t SPAN Max. 31.5 m SPEED Bridge: 4 m/s | Trolley: up to 1.5 m/s | Lift: 0.4 m/s TRAVEL DISTANCE Bridge: up to 500 m | Lift: up to 5.7 m 1 Between rolling processes, an automatic crane supplies the aluminium coils to the tempering furnace for heat after- treatment. 2 The automatic crane has 2 separate lifting gears due to the difference in height between the foot and head sections of the ingot. The position of the grap for putting down and slanting is saved. PROJECT DETAILS 16 automatic cranes for ingot and coil handling. AUTOMATIC CRANES FOR ALUMINIUM COILS AND INGOTS HIGHLIGHTS Speeds of up to 4 m/s and craneway lengths of up to 500 m. REFERENCE PROJECT 1 2 1

RkJQdWJsaXNoZXIy MTUwNzEy