Brochure Special crane systeme | Vollert english

41 40 M3SP, BRAZIL Every year, up to 400,000 m2 worth of concrete for walls and slabs for new and cost-efficient residential space are produced in São Paulo by Brazilian building materials supplier M3SP. The precast concrete parts are placed in a curing chamber and then removed with a special stacker crane. The concrete elements, which weigh up to 15 t, are stored on transport pallets that are precisely stacked and re-stacked one on top of the other in the curing area, thereby saving space. In spite of the high humidity and temperatures of up to 50 °C, construction site supply can be guaranteed at all times. PAYLOAD 15 t SPAN 14.6 m SPEED Bridge: 0.5 m/s | Lift: 0.12/0.19 m/s TRAVEL DISTANCE Bridge: 31 m | Lift: 6.5 m 1 The stacker crane has a span of 14.6 m and transports precast concrete floor slabs weighing up to 15 t PROJECT DETAILS Stacker crane in the curing chamber of a precast concrete part factory. HIGHLIGHTS High humidity and an ambient temperature of up to 50 °C. 1 Every year, up to 400,000 m² worth of concrete is produced for use in walls and ceilings by Brazilian São Paulo-based building materials supplier M3SP 2 The concrete parts are placed into the curing chamber and then removed using a special stacker crane STACKER CRANE FOR PRECAST CONCRETE PARTS REFERENCE PROJECT 1 2 1

RkJQdWJsaXNoZXIy MTUwNzEy