10 WET-COATING FACILITY FOR MOBILE CRANE COMPONENTS WEIGHING UP TO 50 TONS PLANT TECHNOLOGY A separate free-blasting cabin, 2 coating cabins, 2 evaporation and drying cabins, various prepa- ration and storage stations MATERIAL FLOW SYSTEM 2 loading and unloading semi-gantry cranes, distribution manipulator, various pushing sys- tems, fully automatic material flow control 1 Vollert installed the world’s first double-track suspended facility for component parts of up to 50 t in weight at the Liebherr factory in Ehingen 2 A total of 7 cabins is available for sandblasting, priming, coating, and drying workpieces that can be up to 19 m long, 4 m wide and 5 m high 1 2