12 POWDER/WET-COATING FACILITY FOR MECHANICAL ENGINEERING COMPONENTS WEIGHING UP TO 30 TONS PLANT TECHNOLOGY Airless blasting and cleaning cabin, a combined spraying and drying cabin, 2 large- space powder coating cabins, powder firing furnaces, various preparation, cooling and storage stations MATERIAL FLOW SYSTEM Loading and unloading crane, distribution manipulator, two lifting devices in the cabins and preparation stations, in- and output lifters, fully automatic material flow control 1 Stationary lifting facilities in the preparation stations allow parts to be lowered 2 Lifting gears also improve ergonomics in the paint and powder-coating cabins 3 Only the transport crossbeam and the workpiece, the suspension track and the friction wheel drive are located above 1 2 3