31 WORKPIECES Component parts up to 10 t (7.3 m x 2.6 m x 3.2 m) PERFORMANCE DATA Product carriers: Transport carriage Throughput: 1.2 product carriers/h PROCESS TECHNOLOGY SLF Oberflächentechnik GmbH MEILLER, GERMANY Two parallel 70-metre long coating lines serve 14 coating stations at F. X. Meiller. 12 of the parts handled can weigh up to 10 t are able to run through the traveling lines at the same time. The necessary traction is provided by two chain conveyor systems. Pneumatic dis- connection stations in the priming, coating and dryer cabins automatically ensure disconnection and connection of the tow bar in the chain, enabling individual tilting bodies to advance. 1 Pneumatic release stations in the coating cabins ensure automatic connection and disconnection of the drawbar in the chain 2 The components of the tilting budies weigh up to 10 t. They are provided on transport carriages at the start of the coating line and transported fully automatically through the coating stations 1 1 2 REFERENCE PROJECT

RkJQdWJsaXNoZXIy MTUwNzEy