Brochure Shunting systems | Vollert english

18 More information about this project: vollert.de 1 Traction forces of up to 170 kN are produced when pulling the wagons 2 The 1,000 m long special cables have lasted for over 13 years 3 The pusher truck is pushed fully automatically onto the track, coupled to the last wagon and with the help of sensor control and monitored by camera, it pulls the wagons over a shunting length of 450 m under the filling tubes accurate to the millimeter SLAVNEFT-YANOS, RUSSIA Founded in 1961, the Slavneft-Yanos refinery is the fifth largest petroleum processor in Russia with an annual volume of more than 15 million tons. In collaboration with an engineering com- pany, a shunting and loading concept was de- veloped whereby the two standard gauge pusher trucks pull tank wagons with a tensile load of up to 3,200 t and which are also able to drive side-on out of the track after shunting. REFERENCE PROJECT TRACTIVE POWER KN SPEED M/S OUTPUT POWER KW 1 3 2

RkJQdWJsaXNoZXIy MTUwNzEy