16 PROJECT DETAILS High-bay system for 3 storage levels and 300 alu- minium coils, 3 lifting trucks with inductive power transmission, direct manual stacker operation to the high-bay warehouse. 1 Interim storage on three levels each in 52 rows with more than 300 bins a total 2 The high-bay warehouse is connected to the new cold- rolling mill via coil transfer cars EFFICIENT MATERIAL AND STORAGE PROCESSES FOR ALUMINUM COILS HIGHLIGHTS High-bay warehouse integrated into the existing rolling mill hall, connection of the rolling areas via lifting truck with inductive power transmission, furnace char- ging platform for 5 coils with a load capacity of 60 t. 2 1

RkJQdWJsaXNoZXIy MTUwNzEy