29 HEROAL, GERMANY The new heroal high-bay warehouse holds 10,000 long goods and 7,000 Euro pallets. A centrally controlled intralogistics system en- sures a smooth material flow between delivery and dispatch. 60,000 m² hold a high-bay warehouse with eight aisles for long goods and three for small parts, as well as a storage hall with 20,000 m². The heavy-load experts at Vollert took care of connection of the eleven stacker cranes to delivery and packing with dispatch. After all, the transport skips weigh up to 2.3 t. Internal transport is fully auto- mated, from delivery to dispatch. 1 Waiting times are reduced by two lifters lowering the pallets for re- trieval onto rail-bound transfer cars 2 An automatic crane outside the high-bay warehouse serves eight storage cars on a 60 m long crane- way to the stacker cranes of the long goods warehouse 2 1 SKIP WEIGHT up to 2,3 t REFERENCE PROJECT